PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

1) Site Conditions on 1.10.2014.JPG 2) Excavating for Footings C4 - D4.JPG 3) Ice on Site at Footing H1 (3).JPG 4) Inside Formwork for Foundation Wall at Col Line 2.5.JPG 5) Slip Form Prep (2).JPG
Next page 1) Site Conditions on 1.10.2014
1) Site Conditions on 1.10.2014